A lantern festival project cost needs to be assessed against a defined display and delivery scope. A headline total is difficult to compare when one proposal includes different sizes, quantities, lighting configurations or site services. Use an itemised quotation to make the assumptions visible.
Define the display before comparing prices
Create a list of the lanterns and decorative light forms under discussion. Link each item to a reference image or product page, then record its proposed dimensions, quantity and intended location. Identify repeated units and any changes requested from the reference.
Ask what is included in fabrication
- Framework, surface materials, finish and the configuration of the quoted version.
- Light source, colour, controls and power configuration to be agreed for the venue.
- Component divisions, connections and assembly assumptions for larger forms.
- Design development, samples or review records, where these are part of the agreed scope.
Separate the display from delivery and site costs
Ask for packing, shipment and site services to be identified separately where practical. State the destination and access conditions early. Confirm the delivery terms, unloading arrangements, local site preparation and electrical work with the responsible parties; do not assume these are covered by a fabrication price.
Keep alternatives comparable
If the initial concept is beyond the working budget, ask which changes could simplify the scope: fewer unique forms, different dimensions, revised display zones or another lighting configuration. Record the visual and delivery consequences of each alternative. Compare the same scope when reviewing revised quotations.
Prepare an approval-ready quotation checklist
- Reference and revision number for each quoted design.
- Dimensions, quantities, materials and lighting configuration.
- Packing method, destination and agreed transport responsibilities.
- Production and review milestones, with assumptions recorded.
- Site services included, services excluded and the party responsible for each.
- Payment arrangements, change procedure and the validity of the quotation, as agreed with the supplier.
Questions to settle before the next step
Can Jingquan quote from a reference image?
A reference can start the discussion. Dimensions, quantity, destination, timing and the requested scope are still needed to prepare a meaningful quotation.
Is there a universal price per lantern or per square metre?
A single rate does not describe the different forms, sizes, construction details and delivery arrangements in a custom project. Ask for the basis of the actual quotation.
What should I send for a budget review?
Share the venue brief, selected references, approximate quantities and dimensions, target dates and destination. Identify your priorities and any working budget you wish to discuss.
Bring your project into the conversation.
Share your country, venue, planned dates and selected references. Include a plan or photographs when available so the proposed design and scope can be reviewed.
Discuss your project



